I'll start with the arrival of our new baby...the cast iron fireplace. After 3 weeks of waiting she was delivered by a lone delivery man at 14:02 on 04/02, weighing a lot more than I can mange to lift unaided.
Two weeks resting in the hall and with help from Steve, the bonnie lass was installed. Being a drill virgin it was time to borrow a hammer drill (from Steve) and acquire the appropriate drill bit, x4 massive screws and heavy duty wall plugs from Howell's. Job done!
No comments:
Post a Comment